Energy
PROJECT6x40 MW Lower Jurala Hydro Electric Power Scheme
Atmakur, Mahabubnagar District, Telangana
CLIENT: TSGENCO
The Lower Jurala Hydro Electric Power Scheme stands as a major initiative in Telangana’s renewable power infrastructure. Varks played a vital role in executing the civil works required to harness the flow of the Krishna River, transforming it into a dependable source of hydroelectric energy.
Scope of Work
- •Construction of a Weir across the Krishna River
- •Execution of 1.6 km Left Non-Overflow (LNOF) and Right Non-Overflow (RNOF) sections
- •Development of the Overflow Section and Earthen Embankments on both banks
- •Inclusion of De-silting Sluices and associated structures for optimal flow management
Outcome
The project delivers a 240 MW renewable energy capacity, significantly enhancing Telangana’s hydroelectric output while ensuring effective water management and environmental balance.

6x40 MW Lower Jurala Hydro Electric Power Scheme
Atmakur, Mahabubnagar District, Telangana
CLIENT: TSGENCO
Energy
PROJECT
The Lower Jurala Hydro Electric Power Scheme stands as a major initiative in Telangana’s renewable power infrastructure. Varks played a vital role in executing the civil works required to harness the flow of the Krishna River, transforming it into a dependable source of hydroelectric energy.
SCOPE OF WORK
- Construction of a Weir across the Krishna River
- Execution of 1.6 km Left Non-Overflow (LNOF) and Right Non-Overflow (RNOF) sections
- Development of the Overflow Section and Earthen Embankments on both banks
- Inclusion of De-silting Sluices and associated structures for optimal flow management
OUTCOME
The project delivers a 240 MW renewable energy capacity, significantly enhancing Telangana’s hydroelectric output while ensuring effective water management and environmental balance.
